PLEUGER BOREHOLE PUMP BEING REMOVED FROM UNITED UTILITIES FIVE CROSSES SITE IN CHESHIRE.

REMOVAL OF THE UNIT INVOLVED OVER 30 LIFTS AS THE PUMP WAS OVER 185 METRES DEEP ON 10 DIAMETER SECTIONS OF FLANGED STEEL RISING MAIN.

 

THE ORIGINAL OPEN AREA AND THE NEW WELL HEAD AT FIVE CROSSES WHICH WAS FABRICATED TO STOP INGRESS INTO THE BOREHOLE AND PREVENT ANY POSSIBLE CONTAMINATION OF THE WATER SUPPLY

 

    

MATHER + PLATT 3 STAGE MIXED FLOW VERTICAL PUMP SUCCESSFULLY OVERHAULED AND CONVERTED TO A SPLIT TYPE 37 FSB MECHANICAL SEAL. A COMPLETE TURN AROUND TIME OF 2 MONTHS WAS ACHIEVED.

 